Client:
Petroleum Storage Tanks – Clyde Terminal
CATEGORY:
Construct, Recent Projects

Project Issue

Circular reinforcing pattern presented significant challenges for manufacture and assembly of petroleum storage tanks.

What Happened

Prepared 2D and 3D concepts to help design engineers visualise the reinforcement layout, reduce waste, detect potential steel clashes, and produce detailed bar bending schedule and site marking plans.

Results

  • Reduced reinforcing tonnes by 14%
  • Scrap reduced from 12.0% to 1.4%
  • ADDA was faster than traditional scheduling
  • Reduced project costs by 12%

Download the report now

Required fields are marked *
Contact Us