Client:
Swanston Central
CATEGORY:
Construct, Consult, Recent Projects

Project Issue

Traditional in-situ formwork for a 60-level residential tower is slow.

What Happened

Identified time and cost savings in the early design stage by prefabricating 75 steel reinforced columns weighing 4.5 tonnes each.

Results

  • Accelerated construction time
  • Reduced site safety risks
  • Lower overall project costs
  • BIM compatible

Download the report now

Required fields are marked *
Contact Us