Traditional in-situ formwork for a 60-level residential tower is slow.
Identified time and cost savings in the early design stage by prefabricating 75 steel reinforced columns weighing 4.5 tonnes each.
Construct/Recent Projects/
Consult/Recent Projects/
Construct/
Required fields are marked *